Bus Network Redesign

From TransitWiki
Revision as of 18:13, 14 March 2017 by Zaccuardi (talk | contribs) (Created page with "A transit agency may elect to conduct a bus network redesign if it determines that the existing bus network does not meet the needs of current desired travel patterns. This is...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

A transit agency may elect to conduct a bus network redesign if it determines that the existing bus network does not meet the needs of current desired travel patterns. This is likely to occur in cities and regions where development patterns, job types and locations, and/or demographics have changed substantially, and where the bus route network has remained relatively unchanged.

List of bus network redesigns

Transit Agency Date Approved Date Implemented Scope More info
Houston Metro ?? August 1, 2015 Full network redesign System Reimagining[1]
Example Example Example Example Example
Example Example Example Example Example
Example Example Example Example Example
Example Example Example Example Example
Example Example Example Example Example

More resources:

  1. Archived 'System Reimagining' website: http://www.ridemetro.org/Pages/Reimagining.aspx