Portal:Bus Priority Treatments: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 10: | Line 10: | ||
{{Box-footer}} | {{Box-footer}} | ||
<div style='float:left; width:100%'> | <div style='float:left; width:100%'> | ||
{{Template:Box-header | title= BRT Examples | style="vertical-align" | border=#aaaaaa |titleforeground=black | titlebackground=#aaccff | background=#f9f9ff | foreground=black}} | |||
[[File:OrangeLineStop.jpg|thumb|left|400px|A Los Angeles Metro Orange Line BRT bus.]] | |||
[[File:Boston silverline.jpg|thumb|right|400px|Boston's Silver Line bus entering a dedicated lane.]] | |||
{{Box-footer}} | |||
<div style='float:left; width:49%'> | <div style='float:left; width:49%'> | ||
{{Template:Box-header | title=Characteristics of BRT | style="vertical-align" | border=#aaaaaa |titleforeground=black | titlebackground=#aaccff | background=#f9f9ff | foreground=black}} | {{Template:Box-header | title=Characteristics of BRT | style="vertical-align" | border=#aaaaaa |titleforeground=black | titlebackground=#aaccff | background=#f9f9ff | foreground=black}} | ||
| Line 16: | Line 21: | ||
*[[Off-vehicle fare payment]] | *[[Off-vehicle fare payment]] | ||
*[[Bus-on-shoulder]] | *[[Bus-on-shoulder]] | ||
[[File:Sydney.jpg|thumb|right|300px|A dedicated bus lane in Sydney, Australia.]] | |||
{{Box-footer}} | {{Box-footer}} | ||
</div> | </div> | ||
<div style='float:right; width:49%'> | <div style='float:right; width:49%'> | ||
{{Template:Box-header | title= | {{Template:Box-header | title=Bus priority technology | style="vertical-align" | border=#aaaaaa |titleforeground=black | titlebackground=#aaccff | background=#f9f9ff | foreground=black}} | ||
[[ | New technologies are enabling bus transit to replicate some of the speed and capacity advantages that rail transit has traditionally enjoyed. | ||
*[[Transit signal priority (TSP)]] provides buses with extended green cycles, which increases transit speed. | |||
*[[Lane assist technology]] creates opportunities for buses to run in narrow rights of way and to be more precise at passenger stops. | |||
{{Box-footer}} | {{Box-footer}} | ||
</div> | </div> | ||
| Line 32: | Line 36: | ||
{{Box-footer}} | {{Box-footer}} | ||
</div> | </div> | ||
<div style='float:right; width:100%'> | <div style='float:right; width:100%'> | ||
Latest revision as of 21:45, 16 May 2018
Introduction
Bus rapid transit (BRT) has emerged as a favorable alternative to rail transit. BRT runs in dedicated lanes, has separated stations that are more robust than traditional bus stops, and allows off-board fare payment. Transit planners view BRT as a way to provide comparable service to heavy or light rail while witnessing considerable capital cost savings.
Selected Article
BRT Examples
Characteristics of BRT
Bus priority technology
New technologies are enabling bus transit to replicate some of the speed and capacity advantages that rail transit has traditionally enjoyed.
- Transit signal priority (TSP) provides buses with extended green cycles, which increases transit speed.
- Lane assist technology creates opportunities for buses to run in narrow rights of way and to be more precise at passenger stops.
